Excavation Contractor · Grafton, MAGrafton, MA Excavation Contractor
Excavation Contractor for Foundations, Sites & Utilities in Central Massachusetts
Foundation and basement digs, additions, pools, utility trenching, grading, and full site development for homeowners, builders, and developers across Grafton, Worcester County, and MetroWest. Family-owned since 1985, with the owner on every job.Foundations, basements, additions, pools, utility trenching and full site development.
Planning your excavation
Six things that shape every dig
The hole is the easy part. What's in the ground, what's around it, and what goes back in decide how long an excavation takes and what it costs. These are the questions we answer before the first bucket.
-
Buried utilities
Massachusetts requires a Dig Safe notice at least 72 business hours before digging. Private lines aren't marked, so we check for those too.
-
Ledge & boulders
Central Mass soils are full of glacial rock. Shallow ledge means hammering, so test holes early save surprises.
-
Groundwater
A high water table can flood a foundation hole. It affects dig timing, dewatering, and the drainage your basement will need.
-
What's next door
Digging near existing foundations, walls, trees, wells, and septic systems takes planning so nothing nearby is undermined.
-
Where the soil goes
A full basement dig produces hundreds of cubic yards. Some is reused for backfill and grading, and the rest has to be trucked away.
-
Access for equipment
Tight lots, steep driveways, and soft lawns decide which machines we bring, from mini excavators to full-size equipment.

Residential excavation
Foundations, additions & backyard projects
From a new home on a raw lot to an addition squeezed beside an existing house, we prepare the ground for a strong, stable foundation and protect everything around it.
New home foundation excavation
Full basements and crawl spaces dug to the engineered depth and footprint on your plans.
Garage & addition excavation
Careful digs next to existing foundations, with footings tied in at the right elevation.
Pool excavation
In-ground pool digs to the installer's layout, with soil hauled or regraded on site.
Driveways & access
Excavation and base preparation for new driveways, parking areas, and access roads.
Drainage & grading corrections
Fixing low spots and negative grade that send water toward the house. See drainage.
Retaining walls & hardscapes
Base excavation for walls, patios, and outdoor living spaces.
How a foundation dig works
Inside a properly dug basement excavation
A foundation hole is bigger than the house. Crews need room to set forms and waterproof the walls, footings have to sit below frost, and the sides have to be safe to work beside.
- 1Safe side slopes
- OSHA requires sloping, benching, or shoring for excavations 5 feet deep or more, so walls can't cave in on crews.
- 2Over-dig work space
- Extra room outside the walls for forms, waterproofing, and the footing drain.
- 3Footings below frost
- Massachusetts code generally sets footings at least 4 feet below grade so frost can't heave them.
- 4Footing drain
- Perforated pipe in stone at the footing carries groundwater away from the basement walls.
- 5Backfill & grade
- Backfilled in lifts after the walls cure and are waterproofed, then graded to slope away from the house.

Commercial & utility excavation
Built for builders, developers & contractors
On commercial work, excavation sets the pace for every trade that follows. We coordinate closely with project managers and keep the dig on the schedule.
Commercial building excavation
Foundations, footings, and structural pads for commercial, multi-unit, and industrial buildings.
Site development & grading
Cut and fill, building pads, and rough and final grading. See site work.
Parking lots & roadways
Subgrade excavation and base preparation for parking areas, roads, and access drives.
Utility trenching
Water, sewer, electrical, gas, and stormwater trenches dug to depth and line.
Utility-safe digging
Dig Safe on every job, plus our vac truck to expose live lines.
Backfill, compaction & cleanup
Backfill placed and compacted in lifts, and the site left clean for the next phase.
Everything below grade
One contractor for the whole dig
Excavation rarely stands alone. Because we handle every related service in-house, there's no waiting on another sub between phases.
- Site WorkGrading, pads & site prep
- Land ClearingTrees, stumps & brush
- Hammering LedgeRock breaking, no blasting
- Drainage & UtilitiesFrench drains & trenching
- SepticTitle 5 installs & repair
- SewerLaterals & town tie-ins
- Vac TruckHydro excavation
- TruckingHaul-off & delivery
- Emergency Water24/7 line repair
- Emergency Sewer24/7 backups & collapses
Why professional excavation matters
Excavation is the phase you can't redo
Once concrete is poured, mistakes in depth, grade, or backfill are expensive or impossible to fix. Getting the dig right protects everything built on top of it.
Accurate depth & grade
Footings and slabs land at the elevations on the plans, the first time.
Stable foundations
Footings on undisturbed soil or compacted fill, below frost, so nothing heaves or settles.
Dry basements
Proper drains, backfill, and grading keep water away from the walls.
Safe job sites
Sloped or shored excavations and located utilities protect crews and neighbors.
No surprise change orders
Planning for ledge, water, and soil export up front keeps the budget honest.
On-schedule construction
Forms, concrete, and framing crews start on time when the hole is ready.
Our excavation process
From the site visit to a clean, backfilled site
A structured process that leads smoothly into the next phase of construction.
Site evaluation & planning
We review the plans, soils, access, and nearby structures, and plan where soil will go.
Utility locating & safety
Dig Safe is filed, private lines are checked, and the excavation is laid out.
Controlled excavation
Soil is dug to the planned depth and footprint, with safe side slopes and haul-off as needed.
Grading & shaping
The bottom is leveled for footings and the surrounding site shaped to plan.
Backfill & compaction
After walls and drains are in, backfill goes back in lifts and is compacted.
Final grade & cleanup
The site is graded away from the structure and left clean for the next trade.
Project gallery
Excavation in the field
Foundation digs, site development, and utility work by our crew across Central Massachusetts. Tap any photo to enlarge.
Residential & commercial
Excavation for every kind of project
A backyard pool or a commercial pad, the same equipment, planning, and precision.
Service area
Based in Grafton, MA
Excavation services across Worcester County, MetroWest, and surrounding New England communities.
Google reviews
What our customers say
- Mitchell M.Emergency water service line repair★★★★★
“They met me at the building an hour later.”
- Emily E.New septic installation★★★★★
“Anthony and his team got the job done fast and efficiently.”
- Brendan G.Site work project★★★★★
“Executed the job proficiently and went above and beyond.”
- J DExcavation project★★★★★
“Owner was a very hands on guy.”
- Bobby H.Repeat customer★★★★★
“They have done multiple projects for us and have always provided excellent service.”
Excavation FAQ
Questions about excavation
Planning a project? Call (508) 735-3996 and talk directly with the owner.
How much does excavation cost?
It depends on the size and depth of the dig, soil and ledge conditions, groundwater, access, how much soil is reused or trucked away, and backfill and grading needs. We visit the site, review your plans, and give you a free estimate.
How deep do footings need to be in Massachusetts?
Below the frost line, which Massachusetts building code generally sets at a minimum of 4 feet below finished grade. Your plans and local building department set the exact requirement for your project.
How long does it take to dig a foundation?
A typical house foundation can often be dug in one to three days, depending on size, soil, ledge, groundwater, and how much soil has to be hauled away. Ledge or wet conditions can add time.
What happens if you hit ledge?
We break it with a hydraulic hammer, without blasting, and keep digging to grade. Test holes before the dig help plan for it. See hammering ledge.
Do I need permits for excavation?
Most foundations, additions, and pools fall under a building permit, and every dig needs a Dig Safe notice. Work near wetlands may need a Conservation Commission filing, and street openings need town permits. We'll help you understand what applies.
What happens to the soil you dig out?
Good material is stockpiled for backfill and grading. Topsoil is saved for final landscaping. The rest is hauled away with our own trucks.
Can you dig next to my existing house?
Yes. Additions, basement expansions, and drainage work often happen right beside existing foundations. We plan the dig so the existing footing isn't undermined and protect walkways, driveways, and landscaping.
Do you work with my builder or general contractor?
Yes. We work from your plans and coordinate with builders, concrete crews, plumbers, electricians, and inspectors to keep the project on schedule.
Free excavation estimates
Ready to break ground? Let's dig in.
Tell us about your project. We'll walk the site, review your plans, and give you a clear plan and price.