Excavation Contractor for Foundations, Sites & Utilities in Central Massachusetts

Foundation and basement digs, additions, pools, utility trenching, grading, and full site development for homeowners, builders, and developers across Grafton, Worcester County, and MetroWest. Family-owned since 1985, with the owner on every job.Foundations, basements, additions, pools, utility trenching and full site development.

Follow us

Planning your excavation

Six things that shape every dig

The hole is the easy part. What's in the ground, what's around it, and what goes back in decide how long an excavation takes and what it costs. These are the questions we answer before the first bucket.


  • Buried utilities

    Massachusetts requires a Dig Safe notice at least 72 business hours before digging. Private lines aren't marked, so we check for those too.


  • Ledge & boulders

    Central Mass soils are full of glacial rock. Shallow ledge means hammering, so test holes early save surprises.


  • Groundwater

    A high water table can flood a foundation hole. It affects dig timing, dewatering, and the drainage your basement will need.


  • What's next door

    Digging near existing foundations, walls, trees, wells, and septic systems takes planning so nothing nearby is undermined.


  • Where the soil goes

    A full basement dig produces hundreds of cubic yards. Some is reused for backfill and grading, and the rest has to be trucked away.


  • Access for equipment

    Tight lots, steep driveways, and soft lawns decide which machines we bring, from mini excavators to full-size equipment.

Excavator digging in a residential yard for a home addition
Residential excavation for a new addition

Residential excavation

Foundations, additions & backyard projects

From a new home on a raw lot to an addition squeezed beside an existing house, we prepare the ground for a strong, stable foundation and protect everything around it.

  • New home foundation excavation

    Full basements and crawl spaces dug to the engineered depth and footprint on your plans.

  • Garage & addition excavation

    Careful digs next to existing foundations, with footings tied in at the right elevation.

  • Pool excavation

    In-ground pool digs to the installer's layout, with soil hauled or regraded on site.

  • Driveways & access

    Excavation and base preparation for new driveways, parking areas, and access roads.

  • Drainage & grading corrections

    Fixing low spots and negative grade that send water toward the house. See drainage.

  • Retaining walls & hardscapes

    Base excavation for walls, patios, and outdoor living spaces.

How a foundation dig works

Inside a properly dug basement excavation

A foundation hole is bigger than the house. Crews need room to set forms and waterproof the walls, footings have to sit below frost, and the sides have to be safe to work beside.

Basement excavation cross-section Frost line 1 2 3 4 5 Basement
1Safe side slopes
OSHA requires sloping, benching, or shoring for excavations 5 feet deep or more, so walls can't cave in on crews.
2Over-dig work space
Extra room outside the walls for forms, waterproofing, and the footing drain.
3Footings below frost
Massachusetts code generally sets footings at least 4 feet below grade so frost can't heave them.
4Footing drain
Perforated pipe in stone at the footing carries groundwater away from the basement walls.
5Backfill & grade
Backfilled in lifts after the walls cure and are waterproofed, then graded to slope away from the house.
Large excavator on a commercial site development project in Massachusetts
Full-size equipment for commercial work

Commercial & utility excavation

Built for builders, developers & contractors

On commercial work, excavation sets the pace for every trade that follows. We coordinate closely with project managers and keep the dig on the schedule.

  • Commercial building excavation

    Foundations, footings, and structural pads for commercial, multi-unit, and industrial buildings.

  • Site development & grading

    Cut and fill, building pads, and rough and final grading. See site work.

  • Parking lots & roadways

    Subgrade excavation and base preparation for parking areas, roads, and access drives.

  • Utility trenching

    Water, sewer, electrical, gas, and stormwater trenches dug to depth and line.

  • Utility-safe digging

    Dig Safe on every job, plus our vac truck to expose live lines.

  • Backfill, compaction & cleanup

    Backfill placed and compacted in lifts, and the site left clean for the next phase.

Why professional excavation matters

Excavation is the phase you can't redo

Once concrete is poured, mistakes in depth, grade, or backfill are expensive or impossible to fix. Getting the dig right protects everything built on top of it.

  • Accurate depth & grade

    Footings and slabs land at the elevations on the plans, the first time.

  • Stable foundations

    Footings on undisturbed soil or compacted fill, below frost, so nothing heaves or settles.

  • Dry basements

    Proper drains, backfill, and grading keep water away from the walls.

  • Safe job sites

    Sloped or shored excavations and located utilities protect crews and neighbors.

  • No surprise change orders

    Planning for ledge, water, and soil export up front keeps the budget honest.

  • On-schedule construction

    Forms, concrete, and framing crews start on time when the hole is ready.

Our excavation process

From the site visit to a clean, backfilled site

A structured process that leads smoothly into the next phase of construction.

  1. Site evaluation & planning

    We review the plans, soils, access, and nearby structures, and plan where soil will go.

  2. Utility locating & safety

    Dig Safe is filed, private lines are checked, and the excavation is laid out.

  3. Controlled excavation

    Soil is dug to the planned depth and footprint, with safe side slopes and haul-off as needed.

  4. Grading & shaping

    The bottom is leveled for footings and the surrounding site shaped to plan.

  5. Backfill & compaction

    After walls and drains are in, backfill goes back in lifts and is compacted.

  6. Final grade & cleanup

    The site is graded away from the structure and left clean for the next trade.

Residential & commercial

Excavation for every kind of project

A backyard pool or a commercial pad, the same equipment, planning, and precision.

  • New home construction
  • Commercial buildings
  • Land development
  • Infrastructure & utilities
  • Renovations & additions
  • Landscaping & grading

Service area

Based in Grafton, MA

Excavation services across Worcester County, MetroWest, and surrounding New England communities.

  • Grafton
  • Worcester
  • Shrewsbury
  • Westborough
  • Northbridge
  • Millbury
  • Sutton
  • Upton
  • Hopkinton
  • Milford

Google reviews

What our customers say

5.0
★★★★★
Based on Google reviews
  • Mitchell M.Emergency water service line repair
    ★★★★★
    “They met me at the building an hour later.”
  • Emily E.New septic installation
    ★★★★★
    “Anthony and his team got the job done fast and efficiently.”
  • Brendan G.Site work project
    ★★★★★
    “Executed the job proficiently and went above and beyond.”
  • J DExcavation project
    ★★★★★
    “Owner was a very hands on guy.”
  • Bobby H.Repeat customer
    ★★★★★
    “They have done multiple projects for us and have always provided excellent service.”

Excavation FAQ

Questions about excavation

Planning a project? Call (508) 735-3996 and talk directly with the owner.

How much does excavation cost?

It depends on the size and depth of the dig, soil and ledge conditions, groundwater, access, how much soil is reused or trucked away, and backfill and grading needs. We visit the site, review your plans, and give you a free estimate.

How deep do footings need to be in Massachusetts?

Below the frost line, which Massachusetts building code generally sets at a minimum of 4 feet below finished grade. Your plans and local building department set the exact requirement for your project.

How long does it take to dig a foundation?

A typical house foundation can often be dug in one to three days, depending on size, soil, ledge, groundwater, and how much soil has to be hauled away. Ledge or wet conditions can add time.

What happens if you hit ledge?

We break it with a hydraulic hammer, without blasting, and keep digging to grade. Test holes before the dig help plan for it. See hammering ledge.

Do I need permits for excavation?

Most foundations, additions, and pools fall under a building permit, and every dig needs a Dig Safe notice. Work near wetlands may need a Conservation Commission filing, and street openings need town permits. We'll help you understand what applies.

What happens to the soil you dig out?

Good material is stockpiled for backfill and grading. Topsoil is saved for final landscaping. The rest is hauled away with our own trucks.

Can you dig next to my existing house?

Yes. Additions, basement expansions, and drainage work often happen right beside existing foundations. We plan the dig so the existing footing isn't undermined and protect walkways, driveways, and landscaping.

Do you work with my builder or general contractor?

Yes. We work from your plans and coordinate with builders, concrete crews, plumbers, electricians, and inspectors to keep the project on schedule.

Free excavation estimates

Ready to break ground? Let's dig in.

Tell us about your project. We'll walk the site, review your plans, and give you a clear plan and price.